Navy’s Medium USV to Be Based on Commercial Vehicle

An artist’s conception of the L3Harris MUSV. L3HARRIS TECHNOLOGIES

ARLINGTON, Va. — The Medium Unmanned Surface Vehicle (MUSV) being designed and built by L3Harris Technologies will be a purpose-built commercially derived vehicle, the company said in an Aug. 19 release. 

Although the Navy’s selection of Camden, New Jersey-based L3Harris was announced by the Defense Department on July 13, the company’s own Aug. 19 announcement provided a few additional program details. 

“L3Harris will integrate the company’s ASView autonomy technology into a purpose-built 195-foot commercially derived vehicle from a facility along the Gulf Coast of Louisiana,” the announcement said. “The MUSV will provide intelligence, surveillance and reconnaissance to the fleet while maneuvering autonomously and complying with international collision regulations, even in operational environments.” 

As prime contractor, L3Harris will be the lead systems integrator for the MUSV program and will provide the mission autonomy and perception technology for the vessel. Gibbs & Cox and Incat Crowther will design the vessel, which will be constructed by Swiftships in Morgan City, Louisiana. 

Naval Sea Systems Command awarded to L3Harris a $35 million fixed-price-incentive-firm-target contract for the design and fabrication of a prototype MUSV. 

This contract includes “options for up to eight additional MUSVs, logistics packages, engineering support, technical data, and other direct costs, which, if exercised, will bring the cumulative value of this contract to $281 [million],” the Pentagon announcement in July said. 

The prototype MUSV is expected to be completed by December 2022. 

“The MUSV program award reinforces our investments in the unmanned market and demonstrates our ongoing commitment to bring mission-critical capabilities to our warfighters,” Sean Stackley, president of integrated mission systems for L3Harris, said in the Aug. 19 release. “L3Harris is continuing to develop a full range of highly reliable and affordable autonomous maritime capabilities to enable distributed maritime operations in support of the National Defense Strategy.”




MDA Considering Navy’s Aegis System for Homeland Missile Defense

The Missile Defense Agency and U.S. Sailors manning the Aegis Ashore Missile Defense Test Complex at Kauai, Hawaii, conduct a flight test in 2018. MDA is investigating using the Aegis and the SM-3 Block IIB missile as part of a U.S. homeland defense.

WASHINGTON — The Missile Defense Agency (MDA) is investigating the feasibility of using the Navy’s Aegis Combat System and Standard Missile-3 (SM-3) Block IIA as segment of a layered defense of the U.S. homeland. 

“We are investigating the possibility of deploying layered homeland defense for additional opportunities to engage long-range missile threats,” said Vice Adm. Jon A. Hill, director of MDA, speaking in an Aug. 18 webinar sponsored by the Heritage Foundation, a Washington think tank. 

“This means we are investigating the potential of existing proven weapon systems such as Aegis ballistic-missile defense using Standard Missile-3 [SM-3] Block IIA and if that weapon can contribute to homeland defense.” 

Hill said that later this year the MDA will conduct the first Aegis test with SM-3 Block IIA interceptor against an intercontinental ballistic missile (ICBM). He said that the COVID-19 pandemic slowed the preparations but that the test will go ahead. 

“We were ready and postured to go to the Pacific to execute Flight Test Maritime 44 (FTM-44), the first Aegis weapon system engagement against an intercontinental ballistic missile — a long-range ballistic threat being engaged by a ship that’s maneuvering with the SM-3 Block IIA missile,” he said. “Our plan right now is to get that test under our belt before the end of the calendar year. We’re on track to do that.”  

Hill said the FTM-44 test is to be conducted in a “defense of Hawaii” scenario, with a ship and the SM-3 Block IIA. 

“We’re going to really stress the SM-3 Block IIA way outside of its design space,” he said. “It was designed for medium- and intermediate range. Now we’re going against a long-range intercontinental ballistic missile. The analysis says we’ll be successful. But nothing is real to any of us until we actually get the empirical data from being out on the flight range.”  

Hill said that a successful test will not be the end of the work.  

“There will be upgrades required to the missile based on threats,” he said. “We will have to certify the combat system, and we’ve got to work very closely with the Navy about where these ships would deploy and how fast we can increase the production line on the Block IIAs to get those out to sea and where we need them to add that complement to the Ground-Based System. If we succeed with Aegis … [U.S. Northern Command] can decide where they want these assets placed to provide that sort of layered defense.” 

The FTM-44 test will be against an ICBM without countermeasures.  

“It allows us to take a missile that wasn’t designed for that space and just go after that target,” Hill said. “It’s going to be very stressing because of the very long range that it flies, the error that it builds up, so we’ll see how we do.”  

The admiral said that a successful test will allow the MDA “to start to think through that architecture and start working more closely with the warfighters and where they would position a ship. Then we want to march up to another test where would test against a very complex ICBM, one that has a lot of separation debris, one that has a lot of countermeasures. We want to make sure the system in total — from the space assets to the radar to the engage-on-remote capability that passes that information to the ship — and the ship can actually sift through all of that and say, ‘that’s the RV [re-entry vehicle] and that’s where the missile is going to go.’” 

Hill said another challenge is coordinating the engagement coordination between the different layers [of defense.] The systems ‘talk’ with each other already today but the challenge is to get them talking as being different layered defenders.




BAE to Modernize USS Preble Under $103.5 Million Contract

The Arleigh Burke-class guided-missile destroyer USS Preble returns to Joint Base Pearl Harbor-Hickam on June 25 following the ship’s surge deployment to the U.S. 4th Fleet area of operations. U.S. NAVY / Mass Communication Specialist Seaman Jaimar Carson Bondurant

SAN DIEGO — BAE Systems has received a $103.5 million contract from the U.S. Navy for the maintenance and modernization of the Arleigh Burke-class guided-missile destroyer USS Preble, the company said in an Aug. 18 release. The value of the competitively awarded contract could reach $117.7 million if all options are exercised. 

Under the depot maintenance period availability contract awarded, BAE will dry-dock the ship, perform underwater hull preservation work, upgrade the ship’s Aegis combat system and its command-and-control equipment, and refurbish the living spaces for the ship’s 280 crew members. The work is expected to begin in October and be completed in February 2022.  

“The depot maintenance availability BAE Systems will perform aboard USS Preble is complex and critical,” said David M. Thomas Jr., vice president and general manager of BAE Systems San Diego Ship Repair. “Our team of employees, subcontractors and Navy personnel have a great deal of experience with the DDG class and look forward to ushering the USS Preble into its next phase of fleet readiness.” 

BAE Systems’ San Diego shipyard is completing similar work aboard the guided missile destroyer USS Shoup. 

The Preble is the 38th ship in the Arleigh Burke class and was commissioned in 2002. The ship is named in honor of Commodore Edward Preble, an early 19th-century Navy hero. Five previous U.S. naval combatants were named after the commodore.




Coast Guard, CBP Interdicts Suspected Smuggler, 16 Migrants

Two U.S. Customs and Border Patrol surface asset crews interdict a 25-foot pleasure craft with 16 migrants and one suspected smuggler aboard on Aug. 12 about 14 miles east of Haulover Inlet, Florida. U.S. COAST GUARD

MIAMI — The U.S. Coast Guard, along with U.S. Customs and Border Protection Air and Marine Operations (CBP AMO), halted a migrant smuggling operation on Aug. 13 about 14 miles east of Haulover Inlet, Florida, the Coast Guard 7th District said in a release. 

A CBP AMO aircraft crew spotted a 25-foot pleasure craft traveling about 14 miles east of Haulover Inlet and vectored two CBP surface asset crews to the scene. The CBP crews embarked the 11 Haitian males, four Haitian females, one Bahamian male, one Bahamian female and transferred them to the Coast Guard Cutter Manatee crew. 

The smuggler was transferred ashore to CBP custody and the interdicted migrants were repatriated to Freeport, Bahamas. 

“People should never trust these criminal organizations with their lives,” said Lt. Cmdr. Juan Carlos Avila, Coast Guard Sector Miami chief of enforcement. “Attempting to smuggle yourself into the country via the maritime environment is both extremely dangerous and illegal. With the consistent danger these smuggling ventures present, our crews and partner agencies remain persistently vigilant to protect lives and enforce federal laws.” 

The Coast Guard has interdicted about 400 Haitian migrants who have attempted to illegally enter the U.S via the maritime environment in fiscal year 2020, which began Oct. 1, 2019, compared to 885 Haitian migrants in fiscal year 2019. These numbers represent the total number of at-sea interdictions, landings and disruptions in the Florida Straits, the Caribbean and Atlantic Ocean. 

Once aboard a Coast Guard cutter, all migrants receive food, water, shelter and basic medical attention. Throughout the interdiction Coast Guard crew members were equipped with personal protective equipment to minimize potential exposure to any possible case of COVID-19.




Navy Tapped to Lead UFO Task Force

A screen capture of video of a UFO, or Unidentified Aerial Phenomena, captured by U.S. Navy pilots. DEFENSE DEPARTMENT

ARLINGTON, Va. — The U.S. Navy has been selected to lead the Defense Department’s new Unidentified Aerial Phenomena Task Force (UAPTF), the Pentagon said in an Aug. 14 release.   

“On Aug. 4, 2020, Deputy Secretary of Defense David L. Norquist approved the establishment of an Unidentified Aerial Phenomena Task Force,” the release said. “The Department of the Navy, under the cognizance of the Office of the Under Secretary of Defense for Intelligence and Security, will lead the UAPTF.”  

DoD “established the UAPTF to improve its understanding of, and gain insight into, the nature and origins of UAPs,” the release said. “The mission of the task force is to detect, analyze and catalog UAPs that could potentially pose a threat to U.S. national security. 

“As DoD has stated previously, the safety of our personnel and the security of our operations are of paramount concern,” the release said. “The Department of Defense and the military departments take any incursions by unauthorized aircraft into our training ranges or designated airspace very seriously and examine each report. This includes examinations of incursions that are initially reported as UAP when the observer cannot immediately identify what he or she is observing.” 

Earlier this year DoD released infrared imagery of a UAP taken by Navy F/A-18 strike fighters over the western United States.




Boeing Inducts 20th U.S. Navy F/A-18 Into Service Life Modification

An F/A-18F lands on the flight deck of the USS Ronald Reagan while conducting operations in the South China Sea. U.S. NAVY / Mass Communication Specialist 2nd Class Codie L. Soule

ST. LOUIS — Boeing has inducted its 20th F/A-18 Super Hornet into service life modification (SLM), supporting U.S. Navy readiness needs for mission-capable aircraft, the company said in an Aug. 17 release. Two SLM jets already have been returned to the Navy. 

Initially, SLM will extend the life of Super Hornets from 6,000 to 7,500 flight hours. Future modification plans in 2022 will enable the jets to fly 10,000 hours and incorporate Block III capabilities. 

“The Super Hornet is the workhorse fighter for the U.S. Navy,” said Steve Wade, vice president of F/A-18 and EA-18G programs. “SLM is critical because it gives the Super Hornet a new life and next-generation Block III capabilities. The combination of Block III Super Hornets coming out of SLM and new builds off the production line will enable the Navy to maintain the force structure necessary to meet its mission needs.” 

The Block III conversion will include enhanced network capability, conformal fuel tanks, an advanced cockpit system, signature improvements and an enhanced communication system. The updates are expected to keep the F/A-18 in active service for decades to come. 

Boeing is on contract for the modernization of 24 aircraft. An additional contract award covering inductions through 2022 is expected later this year. SLM consists of two production lines in St. Louis and San Antonio, Texas.




USS Pinckney Interdicts $4.5 Million in Cocaine

The Arleigh Burke-class guided-missile destroyer USS Pinckney (DDG 91) with embarked U.S. Coast Guard (USCG) Law Enforcement Detachment (LEDET) team, shown here conducting enhanced counter narcotics operations on July 22. U.S. NAVY / Mass Communication Specialist 3rd Class Erick A. Parsons

MAYPORT, Fla. — The Arleigh Burke-class destroyer USS Pinckney (DDG 91) with embarked U.S. Coast Guard Law Enforcement Detachment (LEDET) team seized over 120 kilograms of suspected cocaine July 24, U.S. 4th Fleet/U.S. Naval Forces Southern Command Public Affairs said in an Aug. 11 release. 

While on routine patrol approximately 200 nautical miles southwest of Jamaica, a helicopter assigned to the “Wolf Pack” of Helicopter Maritime Strike Squadron (HSM) 75 located the vessel and Pinckney soon arrived on scene. After coordination with the government of Colombia and the Colombian navy, the vessel was searched and six suspected drug smugglers were detained. The mariners are now in Colombia’s custody. 

Upon examination, Pinckney personnel determined one detainee required medical assistance, and a medical evacuation was necessary for the patient to survive. That individual was transported further medical treatment.   

Pinckney and the embarked LEDET recovered an estimated 120 kilograms of suspected cocaine worth an estimated wholesale value worth over $4.5 million. 

USS Pinckney is deployed to the U.S. 4th Fleet area of operations conducting U.S Southern Command and Joint Interagency Task Force South’s enhanced counter drug operations missions in the Caribbean and Eastern Pacific. 




Navy Orders 24 Harpoon Cruise Missiles from Boeing

USS Coronado, an Independence-variant littoral combat ship, launches the first over-the-horizon missile engagement using a Harpoon Block 1C missile three years ago. U.S. NAVY / Lt. Bryce Hadley

ARLINGTON, Va. — The U.S. Navy has ordered 24 Harpoon Block II+ Harpoon cruise missiles from Boeing Defense, Space & Security, the Defense Department said in an August 12 announcement. 

The Naval Air Systems Command has awarded Boeing a $15.6 million firm-fixed-price order for the 24 missiles plus 25 captive air training missiles (CATMs). 

The Harpoon Block II+ includes a new GPS guidance kit, improved weapon reliability and survivability, and a new data-link interface that enables in-flight updates and improved target selectivity. Fleet introduction of the Block II+ was achieved in 2017 on the F/A-18E/F followed by the P-8A in 2019.  

A CATM is installed on the weapon pylon of an aircraft and gives the electronic signals of a live missile without an actual launch.  

The order is expected to be completed in August 2023. 




Navy Program Review: Columbia SSBN On Track

An artist rendering of the future Columbia-class ballistic missile submarine. U.S. NAVY

ARLINGTON, Va. — The U.S. Navy’s top acquisition official said the Columbia ballistic-missile submarine is on track and ready for a fiscal 2021 official construction start. 

Speaking Aug. 12 in a teleconference with reporters, James F. Geurts, assistant secretary of the Navy for research, development and acquisition, said the Columbia SSBN program went through a review Aug. 11 with program and shipyard teams. 

“The design maturity of Columbia is exceeding 86% right now,” Geurts said. “We’re focusing on converting that design into manufacturing plans, instructions, [and] material parts. Advance construction is continuing on all of the super-modules.”  

The Navy announced on June 22 a contract modification with Electric Boat that featured an option — that already has been fully priced by the Navy — that would start construction of the first Columbia, SSBN 826, in October (the first quarter of fiscal 2021) and fund advance procurement, advance construction and 2024 construction start of the second Columbia sub, SSBN 827.  

Geurts said at the time that the work of the Navy to price out the two SSBN contract options will help the service keep on schedule and achieve economies on materials and advance procurement for the Columbia class.   

“We’ve got the Build 1 contract in place,” he said in the latest teleconference. “We’re ready to exercise that upon appropriation and authorization in fiscal year 2021. … We’re continuing to ensure that Columbia stays on track as our highest priority program.” 

He said that the COVID-19 pandemic “has not impacted Columbia in terms of readiness to proceed.”




Navy Awards BAE Systems Contract to Modernize Two DDGs

Sailors assigned to the Arleigh Burke-class guided-missile destroyer USS Carney pose for a command photo during the ship’s port visit to Naval Station Souda Bay, Greece, in November 2018. U.S. NAVY / Mass Communication Specialist 1st Class Ryan U. Kledzik

JACKSONVILLE, Fla. — BAE Systems has received an $83.5 million contract from the U.S. Navy to modernize the guided-missile destroyers USS Carney and USS Winston S. Churchill, the company said in an Aug. 11 release. 

The modernization work will be performed sequentially by the company’s shipyard in Jacksonville. The contracts include options that, if exercised, would bring the cumulative value to $211.6 million.  

The USS Carney will be first in the shipyard, arriving in September 2020. The 23-year-old ship just returned from a six-year operational period in Rota, Spain, and will undergo extensive repair and upgrade work that will take more than 400 days to complete. The shipyard will drydock the ship and perform maintenance of the underwater hull, renovation of crew habitability spaces and upgrades to shipboard systems. The modernization is scheduled to be completed in November 2021. 

The Winston S. Churchill will undergo a 390-day maintenance period when the ship arrives in June 2021. The shipyard’s work aboard the 18-year-old ship will include drydocking, replacement of steel structures onboard and support of the electronic systems upgrades. The modernization of the Winston S. Churchill is scheduled to be completed in July 2022. 

“The modernization work aboard the Carney and Winston S. Churchill are significant for our Jacksonville maritime team and important for the service lives and mission capability of these combatants,” said Tim Spratto, general manager of BAE Systems Jacksonville Ship Repair. “The back-to-back sequencing of work is efficient and beneficial for our employees, our subcontractors and our Navy customer.”  

BAE Systems’ Jacksonville shipyard has posted jobs and is expecting to hire workers in a number of trades, including welders, pipefitters, electricians, and painters, over the next two years to work on the two destroyers and for its ongoing repair and modernization work on other ships. 

The award of these two ships will also provide work for our team of subcontractor partners and third-party vendors in the port.  

Commissioned in 1996, the USS Carney is named after Adm. Robert Carney, who served as chief of naval operations during the Eisenhower administration. The USS Winston S. Churchill is named after the renowned British prime minister and was commissioned in 2001.